Open TOE Lab · Timeline

How the lab grew

Every paper, instrument and revision in the Open TOE Lab, in the order it was released. Each is an exercise, not a finding, and each is open to critique.

  1. (approx.)
    Paper

    The Seam: plain-language guide drafted

    The guide to the thought experiment in everyday words, no equations. Later revised (current PDF Oct 12, 2026).

  2. (approx.)
    Release

    Open TOE Lab, Analysis No. 1

    Dr. Norbert Schwarzer’s scaled-metric framework, most recently in Fluid Universe, applied to my Three-Orb paper: papers, the first Scaling Field Console, and a hardware design study, published for critique.

  3. (approx.)
    Paper

    Geometry of a Three-Orb Metastructure, Rev 10.1

    Working paper revision issued with the lab.

  4. Console

    Console: recurrence bench, splay lock, branch bench, seam invariance

    Instruments 01·D, 01·E, 04·B and 01·F, with Problems 7–10.

  5. (approx.)
    Paper

    Rev 10.2

    Second revision of the working paper.

  6. Instrument

    The Unfolding Bench and its shared library

    Delay embedding, recurrence quantification and SLE on one measured signal, with a shared record library (access code).

  7. Volume

    Listening to Living Signals

    A tribute to Dr. Charles Jorgensen, former Chief Neuro Scientist at NASA Ames, and two of his papers published for the first time. 41 pages.

  8. Paper

    Companion papers

    Recurrence and the Seam and The Heartbeat and the Seam, after Jorgensen. Reissued Oct 13, 2026.

  9. Paper

    Rev 10.3, with Schwarzer’s correction

    Adds a correction from Dr. Norbert Schwarzer on the metric tensor.

  10. Notation

    The G = Fn·g notation and dimension sweep

    G is the determinant of the scaled metric, g of the covariant metric tensor. Carried into the console and companion papers.

  11. Instrument

    Unfolding Bench update

    Symbol coding, VRA recurrence and a signature wheel.

  12. Console

    Console update

    Dimension floor, false nearest neighbours, close returns and a TESPAR seam check, with exercise 11.

  13. Release

    Route reports

    One route, every instrument, one PDF, with a readiness wheel and the ratio-4 limit stated plainly.

Dates are Pacific time. “Approx.” marks a date taken from a file or draft record rather than a publication record. Back to the TOE Lab →